By Steve McNeece, Program Manager, Grid Sector, NEMA
As work advances on the next edition of the National Electrical CodeĀ® (NECĀ®) in 2029, the National Electrical Manufacturers Association (NEMA) is sharing industry expertise to help ensure proposed code requirements promote electrical safety and remain clear and practical to implement. Three recent position papers address key issues affecting medium-voltage equipment and infrastructure.
The NEC, published by the National Fire Protection Association (NFPA) as NFPA 70, is revised every three years through an open, consensus-based process. During each cycle, code-making panels review public input and comments from manufacturers, utilities, installers, inspectors, and other stakeholders before changes are adopted.
The NEC is a cornerstone of electrical safety, and its requirements must evolve alongside changing technologies and infrastructure needs. Collaboration among manufacturers, utilities, engineers, installers, inspectors, and standards developers helps align safety goals with the realities of equipment design and field implementation.
The three position papers now available are:
- NEMA SG 80085-2026, Listing Requirements Clarification and Field Evaluation as Alternative for Switchgear and Industrial Control Assemblies Rated at Not Over and Over 15,000 Volts ac or dc, NominalĀ
- NEMA SG 80090-2026, CMP-5 Considerations for Medium-Voltage Grounding and Type MV Cable Accessory Listing Requirements in 2029 NECĀ
- NEMA SG 80091-2026, CMP-9 Considerations for Medium-Voltage Equipment Listing Requirements and Voltage Transformer Primary Fuse Protection in 2029 NECĀ
Preserving Proven Grounding Practices
One proposal for the 2029 NEC would remove a long-standing allowance for multi-grounded systems above 1,000 volts. Medium-voltage systems rely on grounding practices developed and refined over decades of utility and industrial experience. Changes to these practices can affect equipment configuration, insulation, footprint, and existing installations. NEMA encourages evaluating proposed changes holistically, including their effects on utilities, manufacturers, contractors, customers, and facility owners.
A second, related proposal deals with how neutral and grounding conductors are connected inside service-entrance switchgear. NEMA encourages the two proposals to be reviewed together so service-entrance requirements stay clear and consistent.
Clarifying Listing Requirements
Beyond grounding, several new listing requirements raise questions about timing and implementation. Testing, certification, and evaluation are essential to electrical safety, but new requirements must account for available testing capacity, certification pathways, and product availability. Practical transition plans can help maintain access to widely used equipment while reducing the risk of project delays, supply constraints, and uncertainty.
Clear approval pathways are equally important for medium-voltage equipment, which is often customized for specific applications.Ā
The 2026 NEC also introduced future-dated listing requirements for medium-voltage switchgear (Section 495.2) that can be read to depend on operating voltage as well as equipment rating. In addition, Section 268.2 allows service equipment to be listed or field evaluated, while Section 495.2 requires switchgear to be listed. NEMA recommends using the equipment’s voltage rating as the trigger and keeping field evaluation available as an option. Where traditional product listing is not feasible, field evaluation can provide an approval pathway when permitted by the Code and accepted by the authority having jurisdiction. Consistent expectations for when and how these pathways apply can help manufacturers, inspectors, and facility owners implement the Code with greater confidence.
Fuse Access in Sealed Equipment
Medium-voltage equipment operates in varied environments, from outdoor installations to underground vaults and sealed or submersible systems. For example, one proposal would require voltage transformer primary fuses to be accessible without opening a permanently sealed compartment. Requirements like this should account for different equipment designs and operating conditions while maintaining safety objectives.
For equipment that is intentionally sealed, enclosed, submersible, or designed to maintain environmental integrity, implementation details can be particularly important. Coordinating installation rules with the product standards used to design, test, and certify the equipment can further improve consistency and predictability. For example, IEEE C37.74, the main product standard for subsurface, vault, and pad-mounted switchgear, does not currently address access to these fuses.
Looking Ahead
Effective code requirements pair strong safety objectives with clear guidance and achievable implementation. Through its position papers and continued engagement in the 2029 NEC process, NEMA is working to help ensure the Code supports the safe, reliable deployment of medium-voltage equipment that serves communities, businesses, and critical facilities.
Questions or perspectives on medium-voltage topics in the 2029 NEC cycle? Contact the author, Steve McNeece, Program Manager, Grid Sector, NEMA.Ā